Services › Areas › Los Angeles
Home Remodeling & Construction in Los Angeles

As the second-largest city in the United States, Los Angeles offers incredible diversity in home styles - from Spanish Colonial Revival in Silver Lake to Mid-Century Modern in the Hollywood Hills. Oria Builders works with the unique architectural heritage and building codes of this dynamic city.
Why Choose Oria Builders in Los Angeles
- Expert in Spanish Colonial, Craftsman, and Contemporary styles
- Experience with LA's strict permit requirements
- ADU specialists - LA leads California in ADU construction
- Seismic retrofit and hillside construction expertise
Los Angeles Case Studies
- Sophisticated Kitchen Transformation in Silver Lake
Kitchen Remodel · Los Angeles – Silver Lake · $70,000 - $90,000 · 10 weeks · completed 2023-10-15 - Sophisticated Full Remodel in Westwood, Los Angeles
Full Remodel · Los Angeles – Westwood · $150,000 - $300,000 · 3 months · completed 2023-09-15 - Stunning General Remodel in Silver Lake, Los Angeles
General Remodel · Los Angeles – Silver Lake · $150,000 - $250,000 · 3 months · completed 2023-10-15
Typical Remodeling Cost Ranges in Los Angeles
| Service | Typical Range |
|---|---|
| Kitchen Remodel | $35,000 – $85,000 |
| Bathroom Remodel | $18,000 – $40,000 |
| Room Addition | $80,000 – $180,000 |
| ADU Construction | $150,000 – $350,000 |
| Full Home Remodel | $100,000 – $300,000+ |
Ranges vary with scope, size, finishes and permits. Request an estimate for your project.
Services in Los Angeles
Answers for Los Angeles Homeowners
- Can I convert my garage into an ADU in Los Angeles?
Yes. California law allows an existing garage on most single-family and multifamily lots in Los Angeles to be converted into an accessory dwelling unit, the city must approve a complete, code-compliant application within 60 days, and you generally do not have to replace the parking you lose. Because the conversion uses the garage's existing footprint, it is usually the lowest-cost way to add a legal rental or family unit. - How long does an ADU take to build in Los Angeles?
From the first design meeting to final inspection, an ADU in Los Angeles typically takes about 8 to 14 months. Design and engineering usually take 1 to 3 months, permit review up to 60 days for a complete application under state law (longer if corrections are needed), and construction roughly 4 to 6 months for a garage conversion or compact detached unit and 6 to 8 months for a larger or hillside unit. - How much does a bathroom remodel cost in Los Angeles?
In Los Angeles, a hall bathroom remodel that keeps the fixtures where they are typically costs roughly $18,000 to $40,000 in 2026, and a primary bathroom with a new layout, a curbless or tiled walk-in shower, a freestanding tub and custom vanity commonly runs $40,000 to $90,000 or more. Tile work, plumbing relocation and the shower waterproofing system are the parts of the budget that matter most for the long-term result. - What does a general contractor charge in Los Angeles?
General contractors in Los Angeles typically charge an overhead-and-profit markup of roughly 15 to 25 percent on top of labor, materials and subcontractor costs, whether it appears as a line item in a cost-plus contract or is built into a fixed price. On a $100,000 remodel that is usually $15,000 to $25,000 of the total, and it pays for scheduling, permits, inspections, subcontractor management, warranty and the contractor's liability for the finished work. - How much does a room addition cost in Los Angeles?
In Los Angeles, a ground-floor room addition typically costs roughly $300 to $600 per square foot in 2026, so a 250 to 350 square foot bedroom or family room commonly lands between $80,000 and $180,000. Second-story additions usually run $400 to $800 per square foot because the existing foundation and framing have to be strengthened to carry the new load, and bathrooms and kitchens inside an addition push the per-foot cost up. - How much does a kitchen remodel cost in Los Angeles?
In Los Angeles, a kitchen remodel that keeps the existing layout typically costs roughly $35,000 to $85,000 in 2026, and a full gut remodel with a new layout, moved plumbing or gas, custom cabinetry and stone counters commonly runs $85,000 to $200,000 or more. Cabinets, countertops and labor are usually the three largest line items, and moving walls or utilities adds the most cost beyond the finishes themselves.
What Los Angeles Clients Say
Not only did they complete the work within the stipulated time of 2 business days, the overall work was of impeccable finish and quality. The skirtings were re-installed and re-painted to provide a clean, finished look. I would highly recommend Oria Builders to anyone.
— Angadvir P., Los Angeles, California (review on Thumbtack)
He was responsive to the request, flexible with scheduling and most important he completed the tasks as promised. The work was clean and efficient, and the pricing was reasonable. I will certainly engage his services again in the future. Highly recommend.
— James C., Los Angeles, California (review on Thumbtack)
Articles About Los Angeles
- The Complete 2026 Guide: How to Compare Affordable Kitchen Remodeling Contractors in Los Angeles
- Complete Guide: How To Compare Affordable Kitchen Remodeling Contractors in Los Angeles
- Emerging Trends in Outdoor Living Spaces for 2026: Insights for Homeowners in Los Angeles
- Complete Guide: How To Compare Affordable Kitchen Remodeling Contractors in Los Angeles
- The Future of Home Design: Why Design Build is the Way to Go in 2026 - Los Angeles
- Exploring Different Types of Home Additions for Your LA Property | Enhance Your Space in Los Angeles
Neighborhoods We Serve in Los Angeles
Hollywood • Silver Lake • Echo Park • Los Feliz • Westside • Downtown LA • Highland Park
Los Angeles Remodeling FAQ
Do I need permits for remodeling in Los Angeles?
Yes. Most structural, electrical, plumbing, and ADU projects require city permits. Oria Builders handles all LA permitting as part of our design-build service.
How long do remodels take in LA?
Small remodels take 4–8 weeks. Large additions and ADUs typically take 4–9 months. We provide detailed timelines upfront.
Does Oria Builders handle design and permits?
Yes — we provide full design-build services including architectural plans, 3D visualization, and complete permitting.