Oria Builders

ADU models › The 1200

The 1200 — 1,200 sq ft, $400,000

The largest detached ADU California allows: three bedrooms, two baths, a full home.

Everything a family home has in 1,200 square feet on a 40 by 30 footprint: an 18 by 13 living room opening to the patio, a full kitchen and a dining area behind it, and a hall to a primary suite, two more bedrooms or a bedroom and an office, a second bath and a laundry room. Site-built on a permanent foundation, framed on your lot, inspected by your city at every stage.

Best for: A complete second home on your lot; Maximum rental income; Three generations on one property.

The 1200, 1200 sq ft site-built ADU, exterior (design concept rendering) The 1200, kitchen & living (design concept rendering) The 1200, bedroom (design concept rendering) The 1200, bathroom (design concept rendering) The 1200, Three bed, two bath: 3D cutaway floor plan with furniture (design concept rendering) The 1200, Two bed, two bath + office: 3D cutaway floor plan with furniture (design concept rendering) The 1200, kitchen and living in sage green (design concept rendering) The 1200, kitchen and living in walnut (design concept rendering) The 1200, kitchen and living in navy & white (design concept rendering)

Floor plans and pricing

Prices as of October 2026. Kitchen cabinets and countertops are included in every model; finishes to choose from: White & oak, Sage green, Walnut, Navy & white. Bay Area pricing runs about 30% above Los Angeles for labor, fees and materials.

Add-ons

Included in the base price

Design, engineering and permits

Structure and shell

Systems

Kitchen

Priced after the free site visit

Not prefab

These are not prefab or modular boxes. Every model is custom construction: a permanent foundation poured on your lot, walls framed on site, and your city inspecting each stage, the same way the main house was built.

How it works

  1. Free site visit — We check setbacks, utilities, access and the garage or yard, and confirm your price on the spot.
  2. Plans and engineering — Your layout is adapted to the lot, engineered and prepared for submittal.
  3. Permits — We submit, answer plan-check corrections and pull the permit. Time depends on your city.
  4. Construction — 18 to 24 weeks from the start of construction to final inspection.
  5. Final inspection and keys — City sign-off, a walkthrough with you, and the certificate of occupancy.

Renderings and floor plans are design concepts; plans are drawn for each lot after a site visit. Prices are published by Oria Builders and cover plans, permit handling, construction and the kitchen; site-specific items are priced after a free site visit.

Other models

Get a Free EstimateBook a Consultation