Kitchen Remodeling in Burlingame | Case Study | Oria Builders
| Project Type | Kitchen Remodeling |
|---|---|
| Location | Burlingame, CA (Easton Addition) |
| Investment | $65,000 - $85,000 |
| Duration | 12 weeks |
| Completed | 2023-08-15 |
The Challenge
The homeowners in Burlingame’s Easton Addition neighborhood were dealing with a cramped, outdated kitchen that didn’t match the rest of their beautiful mid-century home. The layout was inefficient, with minimal counter space and almost no room for the family to gather comfortably. Storage was a major issue, and the dark cabinetry made the space feel even smaller than it was. Beyond aesthetics, the homeowners wanted to upgrade to energy-efficient appliances and materials, keeping sustainability in mind. They were concerned about navigating Burlingame’s city permitting requirements and ensuring the remodel stayed true to the neighborhood’s upscale vibe while meeting modern functionality.
Our Approach
At Oria Builders, we began with a detailed consultation to understand the family’s needs and vision for their new kitchen. After assessing the existing space, we proposed a complete reconfiguration of the layout to maximize efficiency and flow. We provided 3D renderings to help the homeowners visualize the transformation, incorporating clean lines and a bright, open design. Materials were carefully selected, balancing durability, aesthetics, and sustainability—think quartz countertops, energy-efficient appliances, and custom cabinetry. Navigating Burlingame’s permitting process was smooth thanks to our experience with local codes and regulations. We submitted all necessary documentation and coordinated inspections early to avoid delays. The design also paid homage to the neighborhood’s character while introducing modern elements that elevated the home’s overall appeal.
Build Process
Once the design was finalized, our team started with demolition, carefully removing the old cabinetry, flooring, and appliances while preserving the structural integrity of the home. We adjusted plumbing and electrical layouts to accommodate the new configuration, including adding recessed lighting and upgrading circuits for high-efficiency appliances. Custom cabinetry with soft-close hardware was built onsite to ensure a perfect fit, while the quartz countertops were templated and fabricated to align with the installation schedule. Flooring was replaced with durable, porcelain tiles in a neutral tone to brighten the space. Throughout the process, we maintained strict communication with the homeowners, providing weekly updates and walkthroughs to ensure everything matched their vision. Despite encountering a minor issue with outdated wiring (common in Burlingame’s older homes), we resolved it quickly without impacting the timeline.
Scope of Work
- Demo and removal of existing cabinetry, appliances, and flooring
- Reconfiguration of plumbing and electrical layouts
- Custom cabinet installation with soft-close hardware
- Quartz countertop fabrication and installation
- Porcelain tile flooring replacement
- Installation of energy-efficient appliances and recessed lighting
Materials & Features
- Quartz countertops (Calacatta Gold)
- Porcelain tile flooring, 24x24 format
- Custom shaker-style cabinets in a soft white finish
- Energy-efficient stainless steel appliances
- Recessed LED lighting with dimmer controls
Results
- 35% more usable counter space
- Storage capacity increased by 50% with custom cabinetry
- Energy costs reduced by 20% thanks to efficient appliances and LED lighting
- Estimated $90,000 increase in home value
Project Highlights
- Completed on schedule, within the 12-week timeline
- Zero change orders required during construction
- Custom cabinetry tailored to every corner of the kitchen
- Burlingame permitting process completed without delays
Client Testimonial
"Oria Builders transformed our kitchen into the heart of our home. Every detail was considered, and the team made the process surprisingly stress-free. We couldn’t be happier with the results!"
— Sarah M., Homeowner in Burlingame
Frequently Asked Questions
How long did this kitchen remodeling project take?
The remodel took 12 weeks from start to finish, including demolition, reconfiguration, and final installation.
What was the total investment for this project?
The investment for this project ranged from $65,000 to $85,000, depending on the materials and customizations chosen.
Did the homeowner need to move out during construction?
No, the homeowners chose to stay in their home during the remodel. We coordinated carefully to minimize disruptions and ensure safety.
What permits were required for this project in Burlingame?
We secured permits for electrical and plumbing upgrades, as well as general construction. Burlingame’s city inspectors were involved throughout the process.