| Project Type | Kitchen Remodeling |
|---|---|
| Location | Beverly Hills, CA (Trousdale Estates) |
| Investment | $85,000 - $120,000 |
| Duration | 10 weeks |
| Completed | 2023-07-15 |
The Challenge
The homeowners in Trousdale Estates faced a common dilemma: a dated kitchen that no longer matched the upscale design of their Beverly Hills home. The space felt cramped, poorly lit, and lacked the functionality needed for their busy lifestyle and frequent entertaining. They wanted a sleek, modern design that seamlessly integrated high-end materials with practical features, all while preserving the architectural character of their mid-century home. Additionally, the project needed to comply with Beverly Hills’ strict building codes, which require detailed documentation and inspections throughout the process. The homeowners were also concerned about minimizing disruption, as they planned to stay in the home during construction.
Our Approach
Oria Builders began with a series of collaborative design meetings to understand the homeowners’ vision and day-to-day needs. From there, we developed a tailored plan that balanced aesthetics and functionality, incorporating clean lines, ample storage, and premium finishes. Initial steps included a full 3D rendering of the new kitchen layout, allowing the homeowners to visualize every detail before construction began. We also navigated the Beverly Hills permit process, ensuring all plans met city requirements and were approved without delays. Material selection was a key focus, with the homeowners choosing durable yet elegant options like Calacatta Gold quartz countertops and custom-built cabinetry with soft-close hardware. We worked closely with local suppliers to ensure materials arrived on schedule, avoiding delays often associated with specialized finishes.
Build Process
The project kicked off with a meticulous demo phase, including the removal of outdated cabinetry, flooring, and appliances. Oria Builders’ team ensured the space was prepped for modern electrical and plumbing upgrades, critical to supporting the new appliances and lighting installations. Next came framing adjustments to open up the space and create a more functional flow. Custom cabinetry was installed with painstaking attention to detail, followed by quartz countertops crafted specifically for the new layout. Porcelain tile flooring in a 24x24 format was laid to provide durability and a seamless look. Throughout the build, our project manager maintained clear communication, providing weekly updates that kept the homeowners informed and confident. Despite challenges such as accommodating mid-project design tweaks, the team completed the remodel on schedule.
Scope of Work
- Demo and removal of existing cabinetry and flooring
- Reframing to create a more open layout
- Upgraded electrical and plumbing systems
- Installation of custom cabinetry with soft-close features
- Quartz countertop fabrication and installation
- Porcelain tile flooring installation
Materials & Features
- Calacatta Gold quartz countertops
- Porcelain tile flooring, 24x24 format
- Custom-built shaker-style cabinets with soft-close hardware
- High-efficiency LED recessed lighting
- Stainless steel appliances (Wolf and Sub-Zero)
- Modern matte black fixtures and hardware
Results
- 40% more counter space for food prep and entertaining
- Energy costs reduced by 25% due to efficient appliances and lighting
- Added estimated $125,000 in home value
- Created an open layout that improved traffic flow and usability
Project Highlights
- Completed 1 week ahead of schedule
- Zero change orders during construction
- Premium quartz countertops installed flawlessly
- Efficiently navigated Beverly Hills’ permit and inspection process
Client Testimonial
"We couldn’t be happier with our new kitchen. Oria Builders delivered exactly what we wanted and more—every detail was meticulously executed. The team made the process seamless and stress-free."
— Sarah M., Homeowner in Beverly Hills
Frequently Asked Questions
How long did this kitchen remodeling project take?
The entire project was completed in 10 weeks, including design, permitting, and construction phases. We worked efficiently to ensure no downtime while maintaining the highest standards.
What was the total investment for this project?
The investment range for this kitchen remodel was $85,000 to $120,000. Final costs depend on material choices and any additional customizations.
Did the homeowner need to move out during construction?
No, the homeowners stayed in the property during construction. We coordinated work schedules to minimize disruption and ensured the site remained clean and safe.
What permits were required for this project in Beverly Hills?
We secured permits for electrical upgrades, plumbing adjustments, and structural changes. Beverly Hills requires detailed plans and inspections, which we handled to keep the process smooth.