Oria Builders

ADU in Studio City | Case Study | Oria Builders

Project TypeADU
LocationStudio City, CA (Toluca Lake)
Investment$150,000 - $250,000
Duration12 weeks
Completed2023-08-15

The Challenge

The homeowners in Toluca Lake were facing a common dilemma: the need for additional living space without compromising their outdoor area. With a growing family, they sought to create a comfortable, functional accessory dwelling unit (ADU) that would blend seamlessly with the existing architecture of their home while adhering to Studio City’s stringent zoning and building codes. The challenge was further compounded by the desire to maintain the neighborhood's charming aesthetic, which features a mix of mid-century modern and traditional styles. Ensuring that the new structure would not detract from the surrounding properties was paramount, as was incorporating eco-friendly materials and energy-efficient systems into the design.

Our Approach

Oria Builders began the project with a series of design meetings that focused on understanding the homeowners' vision and needs. We collaborated closely with them to finalize a design that maximized space while maintaining a visually appealing exterior. The process involved selecting materials that were not only durable but also complemented the existing structure. Navigating the permit process in Studio City can often be challenging, but our team is well-versed in local codes and regulations. We ensured all necessary permits were obtained promptly, minimizing delays and setting a solid foundation for the build. The homeowners appreciated our proactive communication, which kept them informed at every stage of the project.

Build Process

Construction commenced with careful site preparation, ensuring that existing landscaping was protected. Our skilled craftsmen focused on creating a foundation that was not only strong but also sustainable. Throughout the build, we emphasized quality and attention to detail, from framing to finish work. Key phases included the installation of energy-efficient windows and doors, which significantly enhance natural light and reduce energy consumption. Regular site meetings ensured that any potential issues were swiftly addressed, keeping the project on track. The construction team worked efficiently, adhering to the 12-week timeline while maintaining high standards of workmanship, resulting in a well-crafted ADU that the homeowners could be proud of.

Results

Project Highlights

Client Testimonial

"Working with Oria Builders was a fantastic experience. They listened to our needs and delivered a beautiful ADU that fits perfectly with our home. The attention to detail was impressive, and we couldn't be happier with the results!"

— Emily R., Homeowner in Studio City
Get a Free EstimateBook Consultation

← All Case Studies